Before we started this project, we thought our basement floor was perfectly level. Well, after 40 years of holding up the house, the floor isn't quite what it used to be. So, we put our shower pan on a base of mortar so that we could level it up before installing the walls.






Here, the hot and cold water lines have been plumbed into the mixing valve, and the lever handle is attached. We tested it out and (for some strange reason) we all jumped out of our shoes (almost) when the water shot out of the spout up top!?